Project Name
Generator Frame Redesign and Inventory Management
Challenge
Boss Industries came to Trusted looking for a quote to compare against other manufacturing existing suppliers.
Solution
Trusted suggested an alternative approach to the traditional quotes that Boss had received. Trusted’s approach involved collaboration between Boss’s product designers and Trusted’s engineers to modify the design and streamline manufacturing and inventory management procedures that would in turn save Boss time and money.
Results
Boss benefited from an 83% reduction in supply chain investment. This table shows the before and after results of the collaboration between Boss product engineers and Trusted manufacturing engineers.